Last week, M2E Vice President Vladimir Markoski and mechanical engineer Hector Alfonso were hard at work at the 500 Brickell project site. Air conditioning coils were being lifted via chopper to the rooftop for replacement.
For more behind the scene photos and videos, visit our Facebook page: https://www.facebook.com/m2econsulting